MDW® Full-Site Launch · Cotes Park, Derbyshire — From Underperformance to World-Class
JohnsonDiversey Cotes Park
From Underperformance to World-Class — Doubling Volume and Halving Cost Through MDW
JohnsonDiversey UK (DiverseyLever / SC Johnson) · Cotes Park, Derbyshire · 110 Employees · Conversion Cost £120 → £70/tonne · Production Volume Doubled
Background
World-Class Infrastructure, Stage 1 Culture
In 2000, the Cotes Park Factory of JohnsonDiversey UK — formerly DiverseyLever, then acquired by SC Johnson — had world-class infrastructure but was operating at Stage 1 Survival: under-utilised, poorly managed on cost, and culturally disengaged. With 110 employees and a legacy workforce structure, the site had the physical capability to be excellent and the organisational culture to prevent it. In November 2001, a bold decision was made: launch MDW across the entire site simultaneously. No pilots. No phased approach. Full commitment signals to the full workforce that this is different.
The Challenge
Reactive Culture, Urgent Cost Crisis, Two UK Sites to Absorb
Conversion costs at £120 per tonne against a £70 target. A reactive, hierarchical culture resistant to change. No training, performance visibility, or reward systems. Consolidation required from two closed UK sites. Legacy employees whose habits were formed before MDW alongside new recruits needing rapid integration. The transformation had to work for both groups simultaneously — with no pilot period and no phase-in.
Stage 1 to Stage 4 in one financial year. £120 to £70. Volume doubled. No exceptions.
Seven Site-Wide KPI Targets
>96% Right First Time — Quality
Total site RFT target — quality owned at the point of production across all lines
>99% Final Inspection — Quality
Final inspection pass rate target — the quality standard that reaches the customer
£70/Tonne — Cost
Conversion cost reduced from £120 — a 42% cost reduction through operational discipline
>95% Plan Adherence — Speed
Schedule reliability across all production lines owned by team leaders
−25% Waste — Cost
Waste reduction target driven by team-level material efficiency ownership
Zero LTAs — Safety
Zero Lost Time Accidents — safety as the non-negotiable first standard
<2.5% Absence — Morale
Absence rate as the engagement metric — people who own their work show up for it
£70
Conversion cost/tonne
(from £120)
2×
Production volume
no headcount increase
9,044
Tonnes (from 8,075)
fewer overtime hours
Nov 2001
Full-site launch
no pilots